
Irrigation Water Releases through Dam/Barrage
| Sl. No | Dam/Barrage | Date | Left Bank Canal (acft ) | Right Bank Canal (acft) | Total water released in acft | 
| 1 | Massanjore Dam | 2018-07-28 | 262.0000 | 0.0000 | 262.0000 | 
| 2 | Tilpara Barrage | 2018-07-28 | 2200.0000 | 1916.0000 | 4116.0000 | 
| 3 | Massanjore Dam | 2018-07-27 | 0.0000 | 0.0000 | 0.0000 | 
| 4 | Tilpara Barrage | 2018-07-27 | 2130.0000 | 2108.0000 | 4238.0000 | 
| 5 | Massanjore Dam | 2018-07-26 | 0.0000 | 0.0000 | 0.0000 | 
| 6 | Tilpara Barrage | 2018-07-26 | 726.0000 | 1634.0000 | 2360.0000 | 
| 7 | Massanjore Dam | 2018-07-25 | 0.0000 | 0.0000 | 0.0000 | 
| 8 | Tilpara Barrage | 2018-07-25 | 776.0000 | 1934.0000 | 2710.0000 | 
| 9 | Massanjore Dam | 2018-07-24 | 0.0000 | 0.0000 | 0.0000 | 
| 10 | Tilpara Barrage | 2018-07-24 | 484.0000 | 934.0000 | 1418.0000 | 
| 11 | Massanjore Dam | 2018-07-23 | 0.0000 | 0.0000 | 0.0000 | 
| 12 | Tilpara Barrage | 2018-07-23 | 1400.0000 | 0.0000 | 1400.0000 | 
| 13 | Massanjore Dam | 2018-07-22 | 0.0000 | 0.0000 | 0.0000 | 
| 14 | Tilpara Barrage | 2018-07-22 | 1400.0000 | 0.0000 | 1400.0000 | 
| 15 | Massanjore Dam | 2018-07-21 | 74.0000 | 0.0000 | 74.0000 | 
| 16 | Tilpara Barrage | 2018-07-21 | 1166.0000 | 0.0000 | 1166.0000 | 
| 17 | Massanjore Dam | 2018-07-20 | 200.0000 | 0.0000 | 200.0000 | 
| 18 | Tilpara Barrage | 2018-07-20 | 0.0000 | 0.0000 | 0.0000 | 
| 19 | Massanjore Dam | 2018-07-19 | 200.0000 | 0.0000 | 200.0000 | 
| 20 | Tilpara Barrage | 2018-07-19 | 0.0000 | 0.0000 | 0.0000 | 
